Tower bridge skaidrės


Tower bridge. Content. History Construction Tower. History. A Special Bridge or Subway Committee was formed in. Construction. Building started in. Tower bridge opening. The bridge was officially opened on 30 June. Tower bridge design. The bridge is. Navigation control. To control the passage of river traffic through the bridge. Tower walkways. The next phase of the restoration of Tower Bridge is the high level walkways. Tower exhibition. Within the Bridge's is magnificent Victorian Engine rooms. Tower facelift. In April. Picture.

History. Construction. Tower bridge opening. Tower bridge design. Navigation control. Tower walkways. Tower exhibition. Tower facelift. Picture.

The next phase of the restoration of Tower Bridge is the high level walkways, 42 metres above the River Thames.

  • MS PowerPoint 610 KB
  • 2015 m.
  • Anglų
  • 11 puslapių (455 žodžiai)
  • Rokas
  • Tower bridge skaidrės
    10 - 7 balsai (-ų)
Peržiūrėti darbą
Tower bridge skaidrės. (2015 m.). https://www.mokslobaze.lt/tower-bridge-skaidres.html Peržiūrėta 2025 m. Gegužės 22 d. 22:04
Peržiūrėti darbą
×
75 mokytojai prisijungę laukia tavo klausimo